SSC CGL Time & Work Questions : 4th March 2019

Dear aspirants,

As you all know, the upcoming months are lined up with various important exams like SSC CGL 2018, RRB JE , SSC CGL , SSC JE and many more, so we are here to help you with the subject that is common to all of the given exams. We are providing daily quantitative aptitude quizzes, practice which will help you to score good marks in this section. We aim to provide the best study material to our readers with exam level questions to help them get used to the recent pattern. Attempt this quiz and check your preparation.

Q1. John does 1/2 piece of work in 3 hours, Joe does 1/4 of the remaining work in 1 hour and George finishes remaining work in 5 hours. How long would it have taken the three working together to do the work?
जॉन 3 घंटे में 1/2 काम पूरा करता है, जोए शेष कार्य का ¼ 1 घंटे में पूरा करता है और जॉर्ज शेष कार्य को 5 घंटे में पूरा करता है. उसी कार्य को तीनों को एकसाथ पूरा करने में कितना समय लगेगा?
(a) 2(1/4) hours/ घंटे
(b) 3(1/7) hours/ घंटे
(c) 3(8/11) hours/ घंटे
(d) 2(8/11) hours/ घंटे

Q2. A does 2/5 of a work in 9 days. Then B joined him and they together completed the remaining work in 6 days. B alone can finish the whole work in
A, 9 दिन में कार्य का 2/5 करता है. फिर B उस से जुड़ता है और वे दोनों एकसाथ शेष कार्य को 6 दिन में पूरा करते हैं. B उसी कार्य को कितने दिन में पूरा कर सकता है?
(a) 12/13 days/ दिन
(b) 2/11 days/ दिन
(c) 10 days/ दिन
(d) 18 days/ दिन

Q3. The daily wages of A and B respectively are Rs. 3.50 and Rs. 2.50. When A finishes a certain work, he gets a total wage of Rs. 63. When B does the same work, he gets a total wage Rs. 75. If both of them do it together what is the cost of the work?
A और B के दैनिक मजदूरी क्रमशः 3.50रु और 2.50रु हैं. जब A एक कार्य को पूरा करता है उसे कुल मजदूरी के रूप में 63रु प्राप्त होते हैं. जब B उसी कार्य को पूरा करता है तो उसे 75रु कि कुल मजदूरी प्राप्त होती है. यदि वे दोनों इसे एकसाथ करते हैं, तो कार्य कि लागत क्या है?
(a) Rs. 67.50/रूपए
(b) Rs. 27.50/ रूपए
(c) Rs. 60.50/ रूपए
(d) Rs. 70.50/ रूपए

Q4. A man does double the work done by a boy in the same time. The number of days that 3 men and 4 boys will take to finish a work which can be done by 10 men in 8 days is
एक आदमी समान समय में एक लड़के द्वारा किए गए कार्य के दोगुना कार्य कर सकता है. जिस कार्य को 10पुरुष 8 दिन में पूरा कर सकते हैं उस कार्य को 3 पुरुष और 4 लड़कों द्वारा पूरा करने में कितना समय लगेगा?
(a) 4
(b) 8(3/5)
(c) 16
(d) 7(3/11)

Q5. P can do (1/4)th of work in 10 days, Q can do 40% of work in 40 days and R can do (1/3)rd of work in 13 days. Who will complete the work first?
P एक कार्य का (1/4) 10 दिन में पूरा कर सकता है, Q कार्य का 40%, 40 दिन में पूरा कर सकता है और R कार्य का (1/3) 13 दिन में पूरा कर सकता है. सबसे पहले कौन कार्य पूरा करेगा?
(a) P
(b) Q
(c) R
(d) Both P and R/ दोनों P और R

Q6. Working 7 hours in a day, 4 men can do a piece of work in 8 days. Working 8 hours in a day, the required number of men to perform the same work in 4 days will be
एक दिन में 7 घंटे कार्य करते हुए, 4 पुरुष एक कार्य को 8 दिन में पूरा कर सकते हैं. एक दिन में 8 घंटे कार्य करते हुए उसी कार्य को 4 दिन में पूरा करने के लिए कितने व्यक्तियों की आवश्यकता होगी?
(a) 8
(b) 4
(c) 7
(d) 9

Q7. The Bubna dam has four inlets. Through the first three inlets, the dam can be filled in 12 minutes; through the second, the third and the fourth inlet, it can be filled in 15 minutes; and through the first and the fourth inlet, in 20 minutes. How much time will it take all the four inlets to fill up the dam?
बुबना बांध के चार पानी भरने के पाइप है. पहले तीन पाइप से, बांध 12 मिनट में भरा जा सकता है; दूसरे, तीसरे और चौथे पाइप द्वारा वह 15 मिनट में भरा जा सकता है; और पहले और चौथे पाइप द्वारा वह 20 मिनट में भरा जा सकता है. बांध को भरने के लिए सभी चार पाइप द्वारा कितना समय लगेगा?
(a) 8 min / मिनट
(b) 10 min/ मिनट
(c) 12 min / मिनट
(d) None of these/ इनमें से कोई नहीं

Q8. Two pipes can fill a cistern in 14 and 16 hours respectively. The pipes are opened simultaneously, and it is found that due to leakage in the bottom of the cistern, it takes 32 minutes extra for the cistern to be filled up. When the cistern is full, in what time will the leak empty it?
दो पाइप किसी टैंक को क्रमश: 14 घंटे और 16 घंटे में भर सकते है. पाइप एक साथ खोले जाते हैं, और यह पाया जाता है कि टैंक के निचले भाग में रिसाव के कारण, टैंक को भरने में 32 मिनट अधिक लगते हैं. जब टैंक भरा होगा, तो कितने समय में रिसाव इसे खाली करेगा?
(a) 114 h / घंटे
(b) 112 h/ घंटे
(c) 100 h / घंटे
(d) 80 h/ घंटे

Q9. The work done by 4 men in 12 days is equal to the work done by 6 women in 10 days and is also equal to the work done by 8 children in 9 days. A man, a woman and a child working together take 10 days to complete a particular job. In how many days will the same job be completed by 2 women and 5 children working together?
12 दिनों में 4 पुरुषों द्वारा किया गया कार्य 10 दिनों में 6 महिलाओं द्वारा किए गए कार्य के बराबर है और 9 दिनों में 8 बच्चों द्वारा किए गए कार्य के बराबर है. एक आदमी, एक महिला और एक बच्चा एक कार्य को पूरा करने के लिए 10 दिन लेते है. वही कार्य 2 महिलाओं और 5 बच्चों द्वारा कितने दिन में पूरा होगा?
(a) 5
(b) 6
(c) 4
(d) 7

Q10. If 35 persons can do a piece of work in 6 days, in how many days can 15 persons do it?
यदि 35 व्यक्ति एक कार्य 6 दिनों में कर सकते हैं, तो 15 व्यक्ति यह कार्य कितने दिनों में कर सकते हैं?
(a) 12
(b) 14
(c) 16
(d) 18

Q11. To complete a work, A and B take 30 days, B and C take 24 days, and C and A take 20 days. They all start together and work for 5 days after which B and C leave. How many more days will A take to finish the remaining work?
एक कार्य को पूरा करने में A और B 30 दिन लगाते हैं, B और C 24 दिन लगाते हैं, और C और A 20 दिन लगाते हैं. वे सभी एक साथ शुरू करते हैं और 5 दिनों के लिए कार्य करते हैं जिसके बाद B और C कार्य को छोड़ देते हैं. शेष कार्य को पूरा करने में A कितने अधिक दिन लेगा?
(a) 11
(b) 28
(c) 33
(d) 18

Q12. Tap a fills a tank in 20 minutes while C empties it at 1/3rd the rate at which A fills it. At 12:00 noon, A and C are simultaneously started and when the tank is 50% full, tap A is turned off. At what time will the tank be empty?
नल A 20 मिनट में एक टैंक को भरता है, जबकि C उस दर के एक-तिहाई की दर से इसे खाली करता है, जिस दर पर A भरता है. दोपहर 12:00 बजे, A और C को एक साथ चलाया जाता है और जब टैंक 50% भर जाता है, तो A को बंद कर दिया जाता है. टैंक किस समय खाली हो जाएगा?
(a) 12:35 pm
(b) 12:45 pm
(c) 12:30 pm
(d) 12:55 pm

Q13. A can do as much work in 4 days as B can do in 5, and B can do as much work in 6 days as C in 7 days. In what time will C do a piece of work which A can do in a week?
A उस कार्य जो 4 दिन में पूरा कर सकता है जिस कार्य को B 5 दिन में पूरा करता है और B उस कार्य को 6 दिन में पूरा कर सकता है जिसे C, 7 दिन में पूरा कर सकता है. जिस कार्य को A एक सप्ताह में पूरा कर सकता है C को उसी कार्य को पूरा करने में कितना समय लगेगा?
(a) 10(5/24) days/ दिन
(b) 4(4/5) days/ दिन
(c) 6(8/15) days/ दिन
(d) 12(6/19) days/दिन

Q14. A can do a piece of work in 10 days and B can do it in 12 days. They work together for 3 days. Then B leaves and A alone continues. 2 days after that C joins and the work is completed in 2 days. In how many days can C do it, if he works alone?
A एक कार्य को 10 दिन में पूरा कर सकता है और B इसे 12 दिन में पूरा कर सकता है. वे डॉन एक साथ 3 दिन कार्य करते हैं. फिर B छोड़ देता है और A कार्य करता है. 2 दिन बाद C उस से जुड़ता है और 2 दिन में कार्य पूरा करता है. यदि C इसे अकेले करता है तो वह इस कार्य को कितने दिन में पूरा करेगा?
(a) 30 days/ दिन
(b) 50 days/ दिन
(c) 40 days/ दिन
(d) 60 days/ दिन

Q15. The ratio of the amount of work done by (x – 1) labours in (x + 1) days and (x + 1) labours in (x + 2) days is 5 : 6. Then the value of x is
(x – 1) लेबर द्वारा (x + 1) दिन में किये गए काम और (x + 1) लेबर द्वारा (x + 2) दिन में किये गए कार्य का अनुपात 5 : 6 है. तो X का मान है:
(a) 16
(b) 15
(c) 17
(d) 14

 

 

You may also like to read: